The IEC TC 57 WG 19 is working on the final draft Technical Report for the communication between Control Centers and underlying systems like Substations, Power Plants, and other applications:

IEC Draft TR 61850-90-2:

COMMUNICATION NETWORK AND SYSTEM FOR POWER UTILITY AUTOMATION –
Part 90-2: USING IEC 61850 FOR THE COMMUNICATION BETWEEN SUBSTATIONS AND CONTROL CENTRES

Big utilities are waiting for the publication of this part. They are looking for a seamless communication at various levels.

This technical report provides a comprehensive overview of the different aspects that need to be considered while using IEC 61850 for information exchange between substations and control or maintenance centres or other system level applications. In particular, this technical report:

  • Defines use cases and communication requirements that require an information exchange between substations and control or maintenance centres
  • Describes the usage of the configuration language of IEC 61850‑6
  • Gives guidelines for the selection of communication services and architectures compatible with IEC 61850
  • Describes the engineering workflow
  • Describes the links regarding the Specific Communication Service Mapping (SCSM)

The utility industry is waiting for the final version. Today, an expert of a big utility stated the following: “From my view, having the alternative to IEC 60870-5-104 and IEC 61850-90-2 for the communication between the substation and the control center my recommendation will be in favour of the 90-2 which allows you to use all 61850 services available comparing with 104 which is more restricted.”

I fully agree with that statement.

By the way, an easy to implement com.tom WEB-PLC based gateway from IEC 61850 (for the down-ling from a gateway) to IEC 61850 (for the up-link to a control center) will be shown during the Hannover Messe next week (07-11 April, hall 13 booth C35/7):

image

The gateway/proxy server provides all crucial features of IEC 61850.

I look forward to showing you the gateway – meet you there.

5 comments:

Unknown said...

Hi,
This sounds interesting. Is there a draft document, or a technical proposal report on 61850-90-2?
regards
Muhammad

Karlheinz Schwarz said...

Dear Kamran Iqbal,

The draft could be accessed for members of IEC TC 57 and working group experts.

Here is a link to a paper that contains also an email you may contact for a copy of the draft:

cigre.org/content/download/17257/682873/version/1/file/B5_2013_2012.pdf

Hope that helps.

Best Regards,
Karlheinz

Unknown said...

Dear Karlheinz,
Thanks for this information, I will contact the relevant person for a draft copy.
I will also keep an eye on your blog about any new news on IEC-61850-90-2.
Regards
Kamran

TakTalks said...

Thank you Karlheinz for that link.

Now, I hope the std. paper IEC 61850-90-2 has been released.
How can I get a copy of technical report of IEC TC 57?

Thanks in advance.
Regards,
Ashok Tak
Undergrad @ IIT, Roorkee, India

Karlheinz Schwarz said...

Dear Ashok,

A new draft has been published by IEC TC 57:
http://blog.iec61850.com/2014/12/draft-tr-iec-61850-90-2-substation-to.html

The draft is available for national mirror committees and members of the working group IEC TC 57 WG 19.